Full review · 2026-07
Review No. 2
On or before 5 Jul 2026. What was examined, how, what was left out, and what the review found.
Predates the programme
Scope
What was reviewed
- Commit
- Commit 2db56348297561b0009efc0bebaaf4a3e2bd050cThe reviewed commit was not recorded. This is the last commit before the first fix from this review.
- Deployed state
- Base (chain 8453). Deployed state was not read in this review.
- Toolchain
- solc 0.8.24 · via_ir, EVM shanghai
- Components
- Core protocol contracts
Limits
Not covered
- No report of this review was archived, so its limits are not known.
Deployed code
Is what is live what was reviewed?
This review did not compare its source with deployed bytecode, so it records nothing about what is live.
Results
Findings
A review from before the programme
Remediation from this review was deployed on 6 Jul 2026. It was carried out before the method, the evidence grading and the disclosure rules of this programme existed, so its findings are not itemised here.
